Florida Construction Lien Law – Site Subcontractors and Material Suppliers Have Special Status

Subcontractors and material suppliers performing work on or supplying materials to building remedial projects in order to establish construction lien rights are required to serve a Notice to Owner to the owner's designate identified in the Notice of Commencement within 45 days of beginning work or supplying materials. Absent the delivery of the Notice to Owner within that time period, they forfeit their lien rights.

Not so with subcontractor and material suppliers involved in site remedial projects including grading, leveling, excavating, and filling of land, including the furnishing of fill soil; the grading and paving of streets, curbs, and sidewalks; the construction of ditches and other area drainage facilities; the laying of pipes and conduits for water, gas, electric, sewage, and drainage purposes; and the construction of canals. Per Florida Statute 713.04, for these type of remedial projects, no Notice of Commencement is required and the subcontractors and suppliers involved need not serve a Notice to Owner.

713.04 Subdivision improvements.—

(1) Any lienor who, regardless of privity, performs services or furnishes material to real property for the purpose of making it suitable as the site for the construction of an improvement or improvements shall be entitled to a lien on the real property for any money that is owed to her or him for her or his services or materials furnished in accordance with her or his contract and the direct contract. The total amount of liens allowed under this section shall not exceed the amount of the direct contract under which the lienor furnishes labor, materials, or services. The work of making real property suitable as the site of an improvement shall include but shall not be limited to the grading, leveling, excavating, and filling of land, including the furnishing of fill soil; the grading and paving of streets, curbs, and sidewalks; the construction of ditches and other area drainage facilities; the laying of pipes and conduits for water, gas, electric, sewage, and drainage purposes; and the construction of canals and shall also include the altering, repairing, and redoing of all these things. . . No lien under this section shall be acquired until a claim of lien is recorded. No notice of commencement shall be filed for liens under this section. No lienor shall be required to serve a notice to owner for liens under this section.

Subcontractors and material suppliers involved in site remedial projects do have one requirement for establishing a valid lien.They must record their lien within 90 days of first performing work or supplying materials to the job. Failure to meet this statutory deadline will result in the loss of their right to claim a lien.

By Alan Tannenbaum, Esq. Board Certified in Construction Law